

Integrated Plug and Abandonment Project
OXY · Miedo Field
Contracted abandonment campaign scope for Miedo Field on the Meta River
- Non-productive time
- 0%
- Period
- 2011
Contract signed in November 2011 for the abandonment campaign for Miedo Field on the shore of the Meta River, Casanare: planning, river logistics, workover rig mobilization and a three-plug cement program (bottom, intermediate and surface) over a six-month term.
- Client
- Occidental de Colombia (OXY)
- Period
- 2011
- Location
- Casanare, Colombia
- Type of work
- Plug & Abandonment



